S01 — Evaluator addendum for UI v0.2
21 October 2026 · Evaluator only · Authored criteria, not participant results
The source packet, original thirteen suggestions, five issue groups, and v1.0 key remain unchanged. This addendum versions the additional recording coverage introduced in UI v0.2. Do not retroactively score Round 1 participants against it. It is excluded from the participant data generator and preview routes.
| Added coverage | Expected representation | Basis |
|---|---|---|
| Current-rent period | USD 19,500/month, through 31 October 2026; original start 1 September 2022 may also be retained. | BL-01/BL-P1/Section 3 and A1-01/A1-P1/Section 2. The original current-date snapshot was already correct. |
| Known option terms | Option exists; 36-month extension; USD 22,000/month if exercised. | BL-01/BL-P2/Section 4, retained by A1-01/A1-P2/Section 4. |
| Conditional extension period | 1 September 2027 through 31 August 2030, if exercised. | Derived from the stated term end and 36-month extension beginning the following day; not a verified exercise or unconditional period. |
| Individual condition checkpoints | No uncured default at notice receipt; no uncured default at extension start; timely compliant written-notice receipt. Each satisfaction status remains not verified. | Base option clause plus amended notice interval; no account/receipt evidence is supplied. |
| Recipient representation | Qualified, readable summary and structured data retain evidence status, period, conditional terms, owner, next action, timing, and sources. | Authored handoff requirement; not a validated organizational release policy. |
These additional fields are not added to the original error denominator. Round 1 has no saved final records or scored task results. The authored v0.2 technical exercise verifies representation, dependency rules, and export integrity; it does not provide practitioner outcomes.
Recording only a conditional label without the known terms or condition checkpoints would be incomplete under this extended content criterion. Interface release checks verify structural readiness, not whether every interpretation or citation is correct. A qualified release remains optional under the S01 policy; full abstract approval remains unavailable.